Installation Facts

Installation Steps

Health Benefits

Contact Us

What's Included

Company Info




Proudly Servicing Canada and the U.S.

 

Installation Steps - Step 3

 

Step Three - Cedar Boards:

 Sheet walls (vertical or horizontal), leaving a 1" space between the floor and bottom board. 

Angle the nails into tongue of each board as shown. 

 

NOTE: For horizontal, start at bottom.

       Enlarge Photo

 

      

      Side Cutaway

Enlarge Photo

 

prev< 1 2 3 >next

 

Back to Top